ASTM D4945 – 12 PDF

ASTM D Pile Driving Analyzer ® Given: 2L/c= 12 ms = T. L. = 75 ft . Broken Piles: β < • “End bearing” is unreliable in long term for broken piles. ASTM D PDF - 1 Nov ASTM D May Standard Test Method for High-Strain Dynamic Testing of Deep Foundations. Historical Version. Astm D High Strain Dynamic Pile Integrity Test Testing (pit) Of Deep Foundations And Concrete Piles, Find Complete Details about Astm D

Author: Nigul Gak
Country: Jordan
Language: English (Spanish)
Genre: Finance
Published (Last): 25 October 2008
Pages: 80
PDF File Size: 20.74 Mb
ePub File Size: 3.90 Mb
ISBN: 275-4-19582-923-4
Downloads: 9795
Price: Free* [*Free Regsitration Required]
Uploader: Akinogrel

Four case studies conducted in Red Sea state were taken. The CASE analysis of high strain bearing capacity detection of single pile and tensile stress and compressive stress analysis of piling monitoring can be conducted; 2. It is d49445 responsibility of the user of this standard to establish appropriate safety, d, and environmental practices and determine the applicability of regulatory limitations prior to use.

This is Portsudan city, which is located in western coast of the Red Sea in eastern Sudan [11]. Link to Active This link will always route to the current Active version of the standard.

This is very clear especially in the results of the pile of tower 1 project. Although interpretation of the dynamic test analysis may provide an estimate astj the pile’s tension uplift capacity, users satm this standard are cautioned to interpret conservatively the side resistance estimated from analysis of a single dynamic measurement location, and to avoid tension capacity estimates altogether for piles with less than 10 m embedded length.

Q The main difference between this system and other dynamic load satm systems is the using of an electronic scanning x4945 that records penetration for each blow and records real time elastic displacement [9]. The analysis of a dynamic ast, will under predict the ultimate axial static compression capacity if the pile movement during the impact event is too small.

The Engineer should determine how the size and shape of the pile, and the properties of the soil or rock beneath and adjacent to the pile, affect the amount of movement required to fully mobilize the static capacity. The analysis of a dynamic test will under predict the ultimate axial static compression capacity if the pile movement during the impact event is too small.

ASTM D – 17 Standard Test Method for High-Strain Dynamic Testing of Deep Foundations

Test Method D provides a direct and more reliable measurement of static tension capacity. These notes and footnotes excluding those in tables and figures shall not be considered as requirements of the standard.

  CCNL METALMECCANICI 2008 PDF

Factors that may affect the axial static capacity estimated from dynamic tests include, but are asstm limited to the:. Original curve, velocity curve, force curve, ashm velocity curve, upper and lower traveling wave curves, displacement velocity curve, energy curve, tensile stress curve asmt other display modes can be selected for observation, processing and analysis; 4.

A permanent net penetration of as d as 2 mm per impact may indicate that sufficient movement has occurred during the impact event to fully mobilize the capacity. Plans, specifications, or provisions or combinations thereof prepared by a qualified engineer may provide additional requirements and procedures as needed to satisfy the objectives of a particular test program. Load-Settlement Curves for Tower No. If the Engineer does not have adequate previous experience for the specific site and pile type with the ast of dynamic test data for tension capacity, then a static load test carried out according to Test Method D should be used to verify tension capacity estimates.

Svinkin analyzed a distinctive case history presented by Briaud et al. Reliable results depend on many factors; Practice D provides a means of evaluating some of those factors.

It is beyond the scope of this standard to consider significant digits used in analysis methods for engineering design. Imperative sentences indicate mandatory provisions. L Load KN 0 0 0.

There are two known methods, based on wave propagation theory, for the analysis and interpretation of the dd4945 pile load test. Force and velocity are typically derived from measured strain and acceleration. The pairs of accelerometers and strain transducers are fixed to opposite sides of the tested pile, about at least one shaft diameter below the head, either by drilling and bolting directly to the pile or by welding mounting blocks to ensure a reasonably uniform stress field at the measuring elevation [5], [2].

Amplification, translation, rotation, filtering and other processing can be carried out for wave signals.

ASTM D +dynamic bored pile test | Nguyen Huu Phuoc –

Help Center Find new research papers in: Referenced Documents purchase separately The documents listed below are referenced within the subject standard but are not provided as part of the standard. The static pile load test is conducted at low strain and takes longer time than the asttm pile load test, which is conducted at considerably higher strain [1]. The dynamic load pile test, which is a simple quality control test offering a considerable asmt of time dd4945 cost and requires less space, can be used for predicting pile capacity and pile integrity under proper care and it should be calibrated by at least one static test.

  GEOMETRIA EUKLIDESOWA PDF

Reporting of test results in units other than SI shall not be regarded as nonconformance with this test method.

The length of the cap should be at least 1. Deep Foundations and Concrete aetm Integrity Test. Reporting of test results in units other than SI shall not be regarded as nonconformance with this test method. In addition, they are representative of the significant digits that should generally be retained. A schematic sketch of SIMBAT equipment and instrumentation is presented in Figure 2whereas a photograph of astj complete set of the equipment is shown in Figure 3.

The Engineer should determine d the size and shape of the pile, and the properties of the soil or rock beneath and adjacent to the pile, affect the amount of movement required to fully mobilize the static capacity. The pile design for projects should be optimized by determining the actual ultimate pile capacity, which may need to conduct pile test to failure or near to failure.

A series of hammer blows are made with the hammer drop height progressively increased and decreased [8].

ASTM D4945-12 PDF

The load should be applied axially on adtm pile. However, high displacement driven piles may require greater movement to avoid under predicting the static capacity, and cast-in-place piles often require a larger cumulative permanent astk penetration for a series of test blows to fully mobilize the capacity. Deep Foundations and Concrete piles. No other units of measurement are included in this standard.

Additional transducers embedded near the pile toe may also help improve tension capacity estimates. CASE damping coefficients can be axtm conveniently to obtain the calculation results of different JC values.

Additional axtm embedded near the pile toe may also help improve tension capacity estimates.

The modern change, which is considered as one of the significant beneficial changes that have been made to the system since the ast Irish survey in is the introduction of theodolite to measure the pile displacement during the impact [6], [7].

The CASE analysis of high strain bearing capacity detection of single pile and tensile stress and compressive stress analysis of piling monitoring can be conducted. Three projects are residential tower buildings representing a part of the residential tower buildings complex of Red Sea state.